We stopped by the house to check on the progress. All of the plumbing, electrical, low voltage, gas and hvac are all in place. The crew was out fixing all of the framing JP marked.
Studs were straightened and added
Some were moved
They patched all the holes
And moved my closet door to the correct location
The yard was filled with stacks of brick. The Savannah Gray I ordered.
The drywall was piled in every room
The windows were installed on our garage doors
And the kids tub is installed
The inspector was just pulling in as we were leaving. It looks like next week is going to be filled with some major changes.