Home Sweet Home

Home Sweet Home
Lot #9043

Wednesday, March 2, 2016

Better late than never

So it's been over 7 months in our new home. It took that long to finally get a rug for our entryway. Procrastinate much?  


We feel very settled and are enjoying watching the neighbors pop up all around us. It's fun to be the "veterans" and answer questions for those in the building process. Although I long for the day I can get my Jeep muddy for fun and not just driving through my neighborhood. 

Wednesday, February 3, 2016

Section 2

It's a beautiful sunny day with mild temperatures. You would never believe it's February. It looks like the groundhog might have been right yesterday. 

It's perfect weather here on The Bluffs and that is nothing but good news for our future residents. 

Each day brings the hustle and bustle of trucks, vans and other equipment that line our streets. Come summertime most of our section will be complete. 


Only 9 more lots are left in Section 1, and that number maybe dwindling while I type.  This has caused the powers that be to give the thumbs up to Section 2. 


At the end of our Bluffview drive sits a gravel turnaround with the forest beyond. All of which is now in the process of being cleared out for the next section. 

 
It will eventually wrap around and meet Brehm boulevard, leading to future sections in the cornfield beyond. 



For now we are enjoying the building process. We like to walk the lots and guess at the model being built.

Next door on lot 9042, a Camden is in its finishing stages. If I had to guess I would say they are roughly 30 days away from closing.  The flooring is in and cabinets are going up. 


Just next door to them on lot 9041, an Austin II is getting their roofing today. 


On the other side of us, on lot 9044, a Hammond is in progress. The framing is being completed and their garage flooring was poured this morning. 


At the entryway to our drive sits lot 9055. A Dartmouth is being built with a side entry 3 car garage. The framing and roofing are complete. They are installing windows and the electrical phase is beginning. 


Down on Brehm boulevard, on lot 9058, another Camden is in the process. It's a popular model here on The Bluffs. 


There are many more homes down the pipeline. I'm looking forward to meeting all of our new neighbors. 



Sunday, December 13, 2015

Our home gym

It took just a few weekends. All the credit goes to my amazing boyfriend, who did all the work by himself. 




He even installed a speaker system 




Now all of our messy storage and utilities are hidden away. 




It's become a very inviting place. I'm already working out more. 

Saturday, December 5, 2015

Living in a construction zone

The two lots on either side of us are under construction. The lot two down from us is underway as well. As is the giant lot on the corner or our street. 

Great news for us!  Come spring time most of the construction near us will be complete. 

Until then...  We spend our days dodging large equipment coming to and fro. And dealing with the mud and mess invading the streets. 

It's nice to have some progress in the neighborhood. Not to mention new neighbors!!


It's winter time here on The Bluffs and the view is amazing. 


Saturday, November 14, 2015

DIY finishing the basement

It started out as a shelving project that turned into a much larger one. 


The next weekend, with a brand new nail gun in hand, framing went up. 



The third weekend lighting was installed



Then drywall was hung



This weekend the mudding process has begun. All DIY by my boyfriend. I'm beyond impressed.  I think we are just over $1000 into a project that would have cost at least $10k through our builder. 




Wednesday, October 28, 2015

The finishing touch to my kitchen

It's been, what?  Almost four months since we found and ordered the perfect pantry door?  After sending it back twice for being cut wrong they finally delivered an uncut door. 

As my boyfriend sees it, it's always the perfect excuse to buy a new rotary tool. 

I came home Monday evening after work to find it already hung and in place. 



I just love this door. My finishing touch was painting it black to add just a little pop to the kitchen. 

Sunday, October 25, 2015

Who Knew?

I worked all weekend while my boyfriend tinkered in the basement, finishing our workout room. 

As it turns out, he's got some skills. I am seriously impressed. It must be that new nail gun. 😉







Friday, October 23, 2015

Fall on The Bluffs.


Our road is just a base layer of asphalt. They will be putting in the final layer as more construction is completed. However, when they poured the end of our driveway they forgot to leave a lip that can allow for another layer of asphalt. So, what does that mean? They had to rip it out.  We have a lovely pit at the end of our driveway for a few days. 


This is the small lip they are trying to mimic. 


Now it's poured. It looks awfully dark but it looks like it's starting to lighten. I just hope the color doesn't stand out too much when it's done. 


The garage has been painted. We chose "poolhouse" by Sherwin Williams. 




The final project, or so we hope, is finishing the basement workout room. 

So far my boyfriend has installed shelving in the utility portion. This weekend he will work on the framing of the workout room. (Note the new nail gun. It's his pride and joy)